首页>>专题报道>>第二届IWHR与KICT学术交流会

会议指南
交流名单
会议日程

您现在的位置: 首页 >> 专题报道 >> 第二届IWHR与KICT学术交流会 >> 论文集
Effects of Large-scale Hydraulic Projects on Sedimentation Control in the Lower Yellow River(Guo Qi
www.iwhr.com     2005-07-14 10:15     


Guo Qingchao


Guo Qingchao   Cao Wenhong
Department of Sediment Engineering, IWHR

Abstract

The main problem existing in the Yellow River is the excessive sediment supply and relative insufficient runoff, which results in severe sedimentation in the lower Yellow River and the formation of ‘perched river’. The situation of flood control becomes more serious. How to reduce the deposition becomes one of the main objectives in regulating the Yellow River. At present, building large hydro-project is an effective and feasible measure which can not only optimize the water-sediment combination to reduce deposition but also earn additional time for engineers to conduct soil-and-water conservation. To better understand the sedimentation processes, sedimentation reduction efficiency and non-deposition period, this paper presents numerical simulation and analysis of 18 options for the sedimentation processes and developing trend in the lower Yellow River for conditions such as sole reservoir operation, two-reservoir combined operation, and three-reservoir combined operation. In addition, based on the observed data since the operation of Sanmenxia Reservoir and the simulation results, the implicit mechanism between large hydro-project operation and lower channel evolution is analyzed. The relationship between the sedimentation in the lower Yellow River and the flow-sediment condition released from Xiaolangdi Reservoir, as well as the critical equilibrium of sedimentation, are established, which provide a scientific basis for reducing deposition effectively by optimizing the operation of hydro-project.


Full Text(180KB)


中国水利水电科学研究院  北京车公庄西路20号 100044
Produced By CMS 网站群内容管理系统 publishdate:2023/07/07 14:25:58