|
|
50m long, 25.5m wide and 1.1m deep is provided for the investigation of wave energy utilization, wave propagation due to dam breach as well as wave protection due to land slide in reservoir. |
Hydropower Project, showing the integra- tion of flaring pier-bottom outletstilling basin to form a new type of energy dissipator. |
|
the flow pattern of an alternative scheme of general layout. |
| Dept. of Hydraulics / Research Center of Disaster
China Institute of Water Resources and Hydropower Research Tel.+86-10-68515511-1053,1594 Fax.+86-10-68538685 |