Lab. of Sedimentation Research on Hydraulic Structures

The laboratory covers an area of 2200m2, being able to provide a discharge of 0.8m3/s, with separate clear and sediment-laden flow system. It is mainly devoted to the studies on intake structures, including the behaviour of sediment movement and the optimum layout to prevent sediment from entering intakes.
 
  
  
Model study to prevent the entry of 
sediment into the intake of Tianshengqiao 
Hydropower Station.
An automatic control and acquisition 
system for measuring and adjusting 
water level and flow rate in model study
A reversible velocimeter using a probe 
of 5mm in diameter
Model study of the intake works 
on the Kushan River to optimize the 
general layout. 
 

Dept. of Sedimentation 
China Insitute of Water Resources and Hydropower Research 
Tel. +86-10-68415522-6659,6626 
Fax.+86-10-68416371