| BJZ-3B/H Rayleigh-Wave Engineering Quality Tester is used for fast non-destructive test of dam construction quality in hydro-power engineering, including engineering quality of concrete. | ![]() |
![]() |
DWG-40 Multi-Extension Meter is used to measure deep layer displacement of rock in drilling holes.The meter has been employed in safety monitoring of rock engineering and measurement of rock mechanics in site. |
| CN Spiral Meter for guided tubes is a special instrument for spiral angle measurement of guided tubes for inclinometer.The principle of the tranducer is based on a bi-direction magnetic flux gate. |
![]() |
![]() |
![]() |
| Concrete Non-destruction Testing Instrument(RL-2000 series)is applied to inspect the crack¡¯s depth in massive concrete structure and concrete slab,the holes and combs in concrete,the interface behavior of concrete and rock,and the performance parameters of concrete structures. |
![]() |
![]() |
Intelligent Measurement & Control System automatic monitoring data acquisition,transmission,display and analysis;remote automatic monitoring of engineering. |
| Intelligent Measurement & Control Cell is the important part of consisting of the Intelligent Measurement & Control System.It has many functions such as measurement, memory, self-test, control, data process, system variate analysis, etc.It can measure paraments including voltage, resistence current, capacitance, inductance, frequency and can directly connect with vibrating wire instruments, resistence instruments, capacitance instruments,inductance instrumens and other tranducers with standard industry signal input. |
![]() |
![]() |
Total Pressure Cell monitoring total pressure acting on a structure to verify design assumption;determining the magnitude,distribution,and orientation of stresses. |
| Piezometer Monitoring pore pressures to determine safe factors of fill or excavation;monitoring pore pressures to determine slope stability; monitoring the effects of dewatering systems used for excavation; monitoring the effects of ground improvement system. |
![]() |
![]() |
Installing the monitoring instrument |
| Engineering Safety Monitoring Center
China Institute of Water Resources and Hydropower Research Tel.+86-10-68415522-6244¡¢6444 Fax£º+86-10-68438317 Email: lijh@iwhr.com Homepage: http://www.iwhr.com/esmc |